Note

NOTE: Most recent posts are shown first. Please use navigation at right to start at the beginning (December 2014)

Wednesday, December 10, 2014

Day 2

Deconstruction Sunday!!  Started off at about 8:45.  This is really the only full day of shop time so it was crucial that a lot get done.  Lots of pictures...

Removed the front sheet metal and stripped the firewall down.



Interior gutted...

Put the Vic up on a steel table.  Welded blocks under the frame to keep it level, safe, and at a comfortable working height.

 Removing the body...




Bare chassis...

Body ready to head to scrap...


Time to tear down the truck...





Bare truck frame...

Moving the cab into place...


Test fit...



This is where we ended up for the day.  About 11 hours for Troy and me, with James joining halfway through.

No comments:

Post a Comment